Mfg Part Number: CK-104 LONG LEAD | Alternate P/N: CK104LONGLEAD | Manufacturer: Crl Components Inc |
NSN : 5910-00-113-5499 | NIIN : 001135499 | Item Name : Capacitor Fixed Cer |
CAGE Code : 71590 | FSC : 5910 Capacitors |
We’re happy to announce that part number CK-104 LONG LEAD with NSN 5910001135499 under FSC 5910 Capacitors is now available in our ready-to-ship inventory. Manufactured by Crl Components Inc under (CAGE Code 71590), this part is a Capacitor Fixed Cer. Would you like a quick quote for this part number? Just fill out the form to get started.
Your quote will be calculated on the basis of your answers to asterisk-marked (*) fields such as Needs Parts By and Quantity (ea), so make sure that you fill them out completely. A dedicated sales representative will respond to your RFQ by email or by phone within 15 minutes of receiving this form.
NSN Purchasing, owned and operated by ASAP Semiconductor, is a leading supplier of NSN part CK-104 LONG LEAD from Crl Components Inc, alongwith more than 2 billion NSN parts in stock. We are an AS9120B, ISO 9001:2015 certified and FAA AC-0056B accredited company. Our vast inventory of ready-to-ship parts and key presence in various locations across the continental US and Canada allow us to fulfill AOG requirements swiftly and efficiently. We also offer same day shipping and next day shipping.
The National Stock Number, also known as NSN, is recognized and utilized as a cataloging system for procuring, stocking, and issuing items by all members of the North Atlantic Treaty Organization (NATO) and the United States’ Department of Defense (DoD). To learn more about CK-104 LONG LEAD with NSN 5910001135499, call us at our toll-free number +1-714-705-4780, or email us at sales@nsnpurchasing.com
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-113-5499 Item Description: Capacitor Fixed Cer | 5910 | 001135499 | 0 | P | A | |
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | A | 0 | |||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
Ck-104 Long Lead | B | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0/+15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS, BROCHURES,ETC., THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS, INDUSTRY DIRECTORIES, AND SIMILAR TRADE PUBLICATIONS, REFLECTI |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION |
Before You Go, Please Take a Look at NSN Parts Catalog!
Request for Quote